Hi, I am using Microsoft Visual Studio Team System 2008 Database Edition GDR Version 9.1.40413.00 and am seeing the same issue.
The master key is being dropped before the certificate and as a result, the deploy to database is failing
Has this been fixed or if not, any ETA for this fix?
The master key is being dropped before the certificate and as a result, the deploy to database is failing
Has this been fixed or if not, any ETA for this fix?